Drop Forged Scaffolding Swivel Clamp - Lightweight & Durable Connector
| Type | Weight | Diameter |
|---|---|---|
| British Drop Forged Swivel Coupler | 1.12kg | 48.3*48.3mm |
| British Drop Forged Double Coupler | 0.98kg | 48.3*48.3mm |
| Girder Coupler | 1.5kg | 48.3mm |
| Sleeve Coupler | 1.0kg | 48.3mm |
| Board Retaining Coupler | 0.6kg | 48.3mm |
| Single Coupler | 0.63kg | 48.3mm |
Product Production Process: The drop forging process involves heating 45# steel before it is shaped into the desired coupler form. Following shaping, the surface is treated with either electro galvanization or HDG to ensure durability and rust resistance.
Product Manufacturing Process: The manufacturing process includes stringent quality checks for material strength and dimensional accuracy. The couplers are crafted using precision engineering to meet BS-1139/EN74 standards, ensuring the best performance in construction environments.
Product Application Industry: Swivel clamps are pivotal in the construction industry for erecting scaffolding, particularly in high-rise building scenarios. They ensure the stability and reliability of scaffolding systems, facilitating safe and efficient construction processes.
Product After-Sales Service FAQ:
- Q: What is the longevity of the swivel clamp from the supplier?
A: Our swivel clamp, with proper maintenance, performs optimally for over 5 years, providing unmatched durability suitable for a variety of construction projects. - Q: What custom options are available for large orders from the manufacturer?
A: For custom orders exceeding 10,000 units, we offer personalized branding and specific packaging solutions, enhancing the value of our swivel clamps for project-specific requirements. - Q: Can your factory support urgent order fulfillment?
A: Our factory is capable of supporting urgent orders, with a supply ability of up to 1,000,000 pieces per month, ensuring timely delivery for critical project needs.
Image Description



