2.Material and Tool Preparation:Procure certified I-beams, coupler-type steel tube scaffolding components, and necessary equipment (wrenches, power drills, etc.).Conduct quality inspections to verify compliance with design specifications.Perform site surveys to ensure level, solid ground free of water accumulation or other safety hazards.
3.Layout and Marking:Mark axis reference lines on the ground using chalk lines.Establish horizontal elevation control lines and vertical plumb lines as installation benchmarks.Use red paint on exterior walls to indicate floor-level horizontal lines and upright spacing points at balconies/windows for alignment verification.
4.Cantilever Installation:Securely install anchor bolts, wire rope clamps, and connection plates to ensure even load distribution and structural integrity.
5.Tiered Assembly:Progressively assemble the structure from bottom to top, integrating horizontal supports, vertical braces, and diagonal bracing to form a unified framework.
6.Inspection and Handover:Conduct thorough inspection before commissioning.Strictly adhere to operational protocols and safety measures throughout construction.Implement regular maintenance checks to guarantee ongoing stability and durability.
Post time: 2025-09-25 10:49:54