1.The base of the upright poles must be equipped with a drainage system to ensure safety and stability.
2.The tie points between the scaffold structure and the building must satisfy the following: horizontally, the distance between every two upright poles should be less than 3.6 meters, and vertically, a tie point should be installed every 3.6 meters.
3.Guardrails and safety nets should be installed from the second step upwards to protect workers' safety.
4.Diagonal bracing should be installed every 9 meters, at an angle between 45 and 60 degrees, to enhance the stability of the scaffold.
5.The spacing between upright poles must not exceed 1.8 meters, and the vertical riser height must not exceed 2 meters, ensuring standardized erection.
6.An isolation layer should be installed every four steps to prevent objects from falling.
7.The scaffold should be equipped with access ramps, and protective sheds should be installed at entrances and passageways to facilitate workers' ascent and descent.
8.Protective grounding and lightning protection grounding should be installed at the four corners of the steel tube scaffold to ensure electrical safety.