1、Check whether a special construction plan, calculation sheet, and official approval are available, and whether the plan can guide actual construction.
2、Verify that the vertical pole foundation meets design requirements, with sufficient bases, base plates, sills, and effective drainage.
3、Insure reliable wall ties between the scaffold and main structure, especially when the scaffold height exceeds 7 meters.
4、Confirm that the spacing of vertical poles, horizontal poles, and diagonal bracing complies with standards; ensure continuous full-height bracing at a proper angle.
5、Check that working platforms are fully planked, equipped with 1.2m guardrails and toe boards.
6、Confirm that safety training and formal acceptance procedures are completed before use.
7、Verify that safe access passages are properly installed.
8、Ensure loading platforms meet calculated load limits, with independent support systems and clear load-limiting signs.