Q355/S355 Black scaffolding tube
Description:
Q355/S355 Black Scaffolding Tube is a high-strength structural steel tube widely used in construction scaffolding systems. It provides stable support, bears heavy loads, ensures safety for elevated work, and allows quick assembly/disassembly. Typical applications include high-rise buildings, bridge maintenance, industrial projects, temporary event structures, and shipbuilding.Key advantages of Q355 material include high strength (yield strength ≥355 MPa), excellent toughness (impact resistance), corrosion resistance (black surface protection), and superior weldability (low cracking risk). It is cost-effective, dimensionally precise, and more durable than conventional scaffolding tubes with lower transport costs.Compliant with GB/T 1591-2018 (equivalent to EN S355), it can be galvanized for enhanced durability and fits various scaffolding couplers, making it a preferred choice for construction and engineering projects.

| Scaffolding Pipes | ||||
| OD(mm) | Thickness(mm) | Length(mm) | Zinc Coating(g/m2) | Quantity/40CTN(pcs) |
| 48.3 | 1.80 | 6000 | 210-500g | 2100 |
| 48.3 | 1.90 | 6000 | 210-500g | 2000 |
| 48.3 | 2.00 | 6000 | 210-500g | 1900 |
| 48.3 | 2.10 | 6000 | 210-500g | 1800 |
| 48.3 | 2.20 | 6000 | 210-500g | 1750 |
| 48.3 | 2.30 | 6000 | 210-500g | 1700 |
| 48.3 | 2.40 | 6000 | 210-500g | 1600 |
| 48.3 | 2.50 | 6000 | 210-500g | 1550 |
| 48.3 | 2.75 | 6000 | 210-500g | 1400 |
| 48.3 | 3.00 | 6000 | 210-500g | 1250 |
| 48.3 | 3.10 | 6000 | 210-500g | 1250 |
| 48.3 | 3.25 | 6000 | 210-500g | 1200 |
| 48.3 | 3.50 | 6000 | 210-500g | 1100 |
| 48.3 | 3.60 | 6000 | 210-500g | 1100 |
| 48.3 | 3.75 | 6000 | 210-500g | 1050 |
| 48.3 | 3.85 | 6000 | 210-500g | 1000 |
| 48.3 | 4.00 | 6000 | 210-500g | 1000 |
| Hot-Dip Galvanized Steel Pipes | |||||||||
| INCH | OD | Standard Wall Thickness | |||||||
| (MM) | SCH 10 | SCH 20 | SCH 40 | SCH 60 | SCH 80 | SCH 100 |
SCH 160 |
XXS | |
| (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | (mm) | ||
| 1/4" | 13.70 | 2.24 | 3.02 | ||||||
| 3/8" | 17.10 | 2.31 | 3.20 | ||||||
| 1/2" | 21.30 | 2.11 | 2.77 | 3.73 | 4.78 | 7.47 | |||
| 3/4 | 26.70 | 2.11 | 2.87 | 3.91 | 5.56 | 7.82 | |||
| 1" | 33.40 | 2.77 | 3.38 | 4.55 | 6.35 | 9.09 | |||
| 1-1/4" | 42.20 | 2.77 | 3.56 | 4.85 | 6.35 | 9.70 | |||
| 1-1/2" | 48.30 | 2.77 | 3.68 | 5.08 | 7.14 | 10.15 | |||
| 2" | 60.30 | 2.77 | 3.91 | 5.54 | 8.74 | 11.07 | |||
| 2-1/2" | 73.00 | 3.05 | 5.16 | 7.01 | 9.53 | 14.02 | |||
| 3" | 88.90 | 3.05 | 5.49 | 7.62 | 11.13 | 15.24 | |||
| 3-1/2" | 101.60 | 3.05 | 5.74 | 8.08 | |||||
| 4" | 114.30 | 3.05 | 4.50 | 6.02 | 8.56 | 13.49 | 17.12 | ||
Parameter:
Type: Scaffolding Tube, Scaffolding Pipe, Galvanized Scaffold Tube
Outer Diameter: 25.6mm;33.5mm; 42.5mm;48.3mm;59mm;60.3mm
Thickness: 2.5mm-4.0mm
Grade: STK400/500,Q235/Q355
Standard: Bs1139, En10219, En39, En74
Surface Treatment: Hot-dip-galvanized, Pre Galvanized, Black, Painted
Packing: Bundled/In Bulk, Plastic Caps Plugged, Waterproof Paper Wrapped
Delivery: Within 10-30 days or depends on your order quantity

Selling Units:Single item
Single package size:100X50X50 cm
Single gross weight:10.000 kg
Supply Ability: 400000 pieces per month
FAQ
- 1.Q:What the main products you can supply?
A:We are the professional and famous factory in China for scaffolding products, our main products is steel prop, frame system, base jack, coupler, steel plank.
2.Q:Will you can accept the customized and OEM products?
A:Yes,we can do the production based on your drawings and with your logo,also because we have very strong design and development team,so the feedback is very good for customized product.
3.Q:What is your payment terms?
A:Commonly two payment term for new customers
1 ) 30%T/T as deposit,70% balance against B/L copy.
2)100% Irrevocable L/C at sight.
If you need other terms, please feel free to contact us too, we will try our best.
4.Q:How about the samples? Is it free to extra fees?
A:Yes,we would like to supply the samples before order, if the samples is on stock, it will be free, if the samples is new production, we will charge some reasonable cost, but this amount will be deducted from your first order invoice.